Skip to content
The register
Plate 01 — Residence18.6411°N 72.8722°E

House of Two Courtyards

Alibaug, Maharashtra
Residence · 2024

Timber-framed verandah of a courtyard house with a tiled roof and deep shaded walkway
[ the dry courtyard, 16:20 ]
LocationAlibaug, Maharashtra
Year2024
TypologyResidence
Area420 m²
StatusCompleted
Duration31 months
ScopeArchitecture · Interiors · Furniture · Landscape coordination

A house that closes for the monsoon and opens without ceremony in October.

The clients spend nine months of the year in Mumbai and the other three here, mostly during the rains. The brief was unusually precise about absence: the house had to be shuttable in a morning, survive three weeks of closed humidity without growing anything, and reopen without a week of repair. Everything else followed from that.

A long water channel running the length of a paved courtyard between ochre walls
[ a long water channel running the length of a paved courtyard between ochre walls ]Alibaug · 2024
Approach01 · Alibaug

Two courtyards do the work. The northern one is planted and takes water — the roofs drain into it, and in August it runs as a shallow tank. The southern one is dry, paved in Kota, and holds the house together socially: it is where the table goes when there are more than six people.

Rooms are single-banked around them, so every room has openings on two sides and nothing is more than 4.2 m from outside air. Circulation happens under a 2.4 m deep verandah that never carries direct sun after ten in the morning. There are no internal corridors.

The section is the argument. The roof pitches at 22° toward the wet courtyard, and the eaves oversail by 1.1 m, enough that the shutters can stay open through most of a downpour. Rain is not screened out; it is given a place to land where you can watch it.

Raking afternoon light cutting a hard diagonal across a bare plaster corner
Stone colonnade with planting, seen down the length of a shaded walkway
[ shaded circulation and courtyard light ]Plates 01/03–04
Material paletteKota · Lime · Teak
A mature tree standing in the planted courtyard, seen from below
Kota stone
Honed, 30 mm, laid in random-length courses. Floors, courtyard paving, the long kitchen counter.
Lime plaster
Three-coat, unpigmented, burnished on internal walls and left matte externally. It moves with the salt air instead of resisting it.
Burma teak
Salvaged from a demolished mill floor in Wadala. Shutters, door frames, the verandah structure.
Terracotta jaali
Pressed locally in Pen, 180 mm module. Used where the bathrooms meet the north wall.
Brass
Unlacquered. Ironmongery only. It has already gone brown, which is correct.
Masonry passage between two wings of the house, open to the sky
[ masonry passage between two wings of the house, open to the sky ]Plate 01/05
Site & performanceMeasured, not modelled
Rainfall
2 400 mm annually, 80 % of it between June and September.
Distance to sea
6.1 km. Salt reaches the site; no mild steel is exposed anywhere.
Orientation
Long axis 8° off east–west. The south verandah is self-shading from 10:00.
Ground
Laterite at 1.2 m. Foundations are stepped rather than cut.
  • The wet courtyard was value-engineered out twice and reinstated twice. It is the reason the house works.
  • Shutters are hung on pivot hinges rather than butt hinges so they can be lifted off and stacked before the family leaves.
  • There is no air conditioning in the living spaces. There is in both bedrooms; the clients asked, and we would rather it be visible than smuggled in.

A house that closes for the monsoon and opens without ceremony in October.

Plate 01 — AlibaugKota · Lime · Teak
CreditsNERA / ARCHIVE · Completed
Design team
Atelier NERA — R. Naik, S. Mehrotra, A. Fernandes
Structure
Kanade Consultants, Pune
Main contractor
S. K. Patil & Sons, Alibaug
Stone
Deccan Kota, Kolhapur
Joinery
Workshop 41, Assagao
Photography
Plates 001–034, studio archive
A mature tree standing in the planted courtyard, seen from below
Concrete stair and landing in the service court, early morning
[ detail plates ]01/08–09
Next plate02 →
Kala Ghoda Rooms Mumbai · Hospitality
2023